Simple foundation construction method for NETIS registration! Here are examples of construction in areas where water cannot be drained.
Places where water cannot be drained We will introduce examples of the pin foundation construction method. In conventional methods, foundation work could not be done without draining water from wetlands or lakes, but with the pin foundation method, underwater construction can be carried out by divers in the existing state. 【Case Study】 ■ Chigoike Park (Miyazaki Prefecture) ■ Structure: Effective width 2.5m, pillar pitch 2.0m ■ Materials Used - Railing: Aluminum, cedar - Floorboards: Cedar - Structural materials: Aluminum alloy, greenheart wood ■ Foundation Type: DP-100 *For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the catalog or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
■FRP materials that are lightweight, have high strength per unit weight, are corrosion-resistant, and are strong against salt damage. ■Pin foundation bases that do not require heavy machinery and do not need excavation of the ground surface. Our company has introduced these two technologies ahead of other companies in Japan and boasts a wealth of construction achievements. We are involved in the design and construction of bridges, decks, boardwalks, and piers in national parks and theme parks that are well-known to everyone. By partnering with a Dutch company and introducing new technology using FRP materials, we have made it possible to construct long-span FRP bridges, which were previously difficult to achieve. Furthermore, a durability of over 60 years is expected, making this a technology that can open up new markets in the future.