Achieving short delivery times through creative ingenuity! Supporting product development with ADC12 machining and unique equipment.
We received an inquiry from an automotive design company stating, "The design specifications have changed multiple times, the drawings are delayed, and the deadline for prototypes is approaching. Is there anything we can do about it?" They requested the delivery of 15 units within one month and asked us to review the design drawings, specifying that they wanted to consider two methods: gypsum casting and machining (full machining). Since the desired delivery date was already less than a month away, we determined that gypsum casting would not be feasible and proposed the machining (full machining) method instead. We explained that we would use ADC12 block material for the prototypes, which has the same material properties as the mass-produced items. Using a horizontal machining center, we were able to set up the next material in the spare pallet even during processing, allowing us to continue machining without stopping the machine, and we were able to deliver as scheduled in three weeks. [Case Study] ■ Application: Prototype of car navigation housing ■ Method: ADC12 machining ■ Size: 200×120×40 (mm) ■ Delivery Time: 3 weeks ■ Quantity: 15 units *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Proposal】 ■ Machining using ADC12 without nests - We propose a machining method using total machining. - A test-use ADC12 block material will be used. - Material properties similar to mass-produced items. ■ Production plan using horizontal machining centers - Can be accommodated with a special production plan and processing preparations (fixture manufacturing). - The cost is approximately 120,000 yen per unit. 【Points】 ■ Horizontal machining center - The next material can be set in the standby pallet even during processing. - Continuous machining is possible without stopping the machine. - A schedule is set to run for 22 hours a day and executed. - As a result, what usually takes 1.5 months is completed in 3 weeks. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Our company specializes in machining ADC12 through cutting. We excel at processes that "cut out" shapes from solid metal, rather than standard hole machining or contour machining. Our equipment primarily consists of Okuma machining centers, which are highly precise and suitable for prototyping. We are currently expanding new orders, focusing on our younger staff! We also sell ADC12 sheet materials and round bars.