Height of 120m! Introducing the case of the "Ushiku Great Buddha," designed and constructed by our company!
Here is a case study of the "Great Buddha of Ushiku," which we designed and constructed. Completed in 1993 after seven years of work. We introduced the Ushiku Great Buddha Monitoring System (Structural Health Monitoring). This system measures the vibrations of the structure caused by earthquakes and wind in real-time using observation equipment installed in the building, allowing for the assessment of safety and impact. It has been operational since April 2016, integrated into the Great Buddha of Ushiku. [Construction Case] ■ Great Buddha of Ushiku (Ibaraki Prefecture) - Introduction of the Ushiku Great Buddha Monitoring System (Structural Health Monitoring) *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Kawata Industrial Co., Ltd.'s Construction Division is engaged in the construction of hospitals, offices, and apartment complexes. Additionally, we are involved in the design and construction of special buildings represented by the Ushiku Great Buddha, the evolution of system construction methods introduced from the United States for the construction of large space production and logistics facilities, and we contribute to society through the provision of environmental products such as greening and geothermal heat pump systems.