Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on a wealth of experience in roofing work for major housing manufacturers over many years. Since we do not subcontract, we can quickly respond to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Sharp Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■K's residence in Ora Town, Gunma Prefecture ■Construction date: July 2018 ■Construction period (installation and electrical work): 2 days ■Selected model specifications: Sharp ■Mounting method: Support tile method ■Module: 4.620 kW NU-X22AF
catalog(1)
Download All CatalogsCompany information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Record Case 45]](https://image.mono.ipros.com/public/product/image/6dc/2000112696/IPROS5406863214769080083.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 51]](https://image.mono.ipros.com/public/product/image/77a/2000112704/IPROS2503443456269414613.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 261]](https://image.mono.ipros.com/public/product/image/a78/2000165150/IPROS2498160521494027667.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 391]](https://image.mono.ipros.com/public/product/image/9a7/2000200341/IPROS7915720718234172862.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 512]](https://image.mono.ipros.com/public/product/image/7e5/2000235629/IPROS5347680838961928474.jpg?w=280&h=280)
![[Case Study] Shinano no Hoshi Headquarters](https://image.mono.ipros.com/public/product/image/4d4/2001173976/IPROS70511111493290832255.png?w=280&h=280)
![[All-Electric Construction Case] Solar Power Generation System <2010>](https://image.mono.ipros.com/public/product/image/9ff/2001118512/IPROS17900836253036117933.jpeg?w=280&h=280)

![[Column] Advantages and Disadvantages of Solar Power PPA Business](https://image.mono.ipros.com/public/product/image/e34/2000667961/IPROS04478790006577702378.png?w=280&h=280)
![[Information] Introduction to Solar Power Generation - How to Use Solar Power Generation](https://image.mono.ipros.com/public/product/image/2090347/IPROS17025582817028032583.png?w=280&h=280)


