Buildings that have tilted can be corrected with subsidence repair work!
"Settlement correction work" introduces the flow from the occurrence of differential settlement to the correction work. A commonly used method is the steel pipe pile driving method, which supports the building's load by driving steel pipe piles into the supporting ground using jacks, thereby supporting and correcting the entire building. [Contents] ■ Building level measurement (current situation assessment) ■ Flow from the occurrence of differential settlement to correction work ■ Steel pipe pile driving method ■ Overview of each method *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
-