Simplifying the project and reducing the number of items makes both construction and management easy! Introducing the evolved pin net method, "Net Barrier Method P1."
Renotech has been involved in general repair work as a professional since its establishment. The pin-net method "Net Barrier Method P1" is effective in preventing the detachment of exterior wall finishing materials (tiles and mortar) from buildings. 【What are the differences from conventional pin-net methods?】 ■ The powder used requires no "mixing agent" and only needs water added for mixing! Base adjustment, net installation, and finishing paint can all be handled with just one type. ■ No primer application is needed for existing substrates and pin heads! *Some conditions apply; see the notes below. ■ No resin injection into anchor pins is required! ↓ As a result… ☑ Simplification of processes leads to reduced construction time. ☑ Reduction of costs for powder mixing agents, primers, and injection materials, as well as the hassle of disposing of empty cans. ☑ Fewer items reduce the burden of order management and inventory management. Additionally, this method allows for the covering of existing finishing materials (such as tiles) with a new paint finish, maintaining aesthetics while reducing waste disposal costs. Furthermore, the use of robust nets and core rod-driven anchor pins provides excellent detachment prevention effects. It also comes with a 10-year warranty. *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
[Notes] ■Regarding the non-necessity of applying primer to existing substrates and pin heads, a sealer application is required only when substrate absorption is significant. ■For substrate floating of less than 2.0m2, it is possible to proceed with construction while leaving it as is. However, if there are blisters, removal and mortar correction are necessary. *For more details, please refer to the PDF materials or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Construction Achievements】 ■Schools ■Hospitals ■Apartments/Buildings ■Commercial Facilities *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
At Rino Tech Co., Ltd., we are committed to reliable renovation work and the active accumulation of technical expertise. Our approach to renovation work is based on the belief that buildings and civil engineering structures should be maintained in a sound condition as if they were newly constructed. We aim to be a unique presence in the industry from a management strategy perspective, through independent technology development and knowledge consolidation, including software strategies. We strive to be a company that you can trust and rely on with confidence.