Ground improvement work ☆ Deep mixing method 'T-column method' * Certification obtained
T-column method
This is a columnar improvement project of deep mixing treatment made possible by a self-developed stirring device (patent obtained) that enables high quality, low cost, and flexible responsiveness!
The T-column method is a construction technique that involves excavating the ground while injecting cement-based solidifying materials. Using a uniquely developed mixing device, it efficiently mixes and stirs the solidifying materials with the soil, creating stable, high-quality columns (columnar improved bodies). ■ Japan Building Center Foundation Construction Technology Review Certification (Building Technology) BCJ-Review Certification-219 ■ NETIS Number KT-150083-A <Features> - Maximum column diameter of 1.60 m and maximum depth of 16 m. It is possible to construct up to the maximum column diameter using a base machine of 0.7 m³ class without the need for a three-point pile driver. It can accommodate various soil types, including clay, sandy soil, and loam, allowing for flexible responses to various road and surrounding conditions. - By using a fully automated plant, the slurry production process can be managed, ensuring stable quality. - In the case of small-scale buildings, a mold core can be created by taking depth mold samples. There is no need to collect boring cores, which reduces construction time and costs. *Documents can be downloaded from the related links.
Inquire About This Product
basic information
【Scope of Application】 Column diameter: 600 to 160 mm Maximum construction depth: 16.0 m Applicable ground: Clay, sandy soil, loam Improvement types: Pile type (pile arrangement, circular arrangement, lap arrangement), block type, wall type Applicability: Foundation ground for structures such as buildings, civil engineering structures, retaining walls, and works Number of mixing shafts: Single shaft Mixing mechanism: Unidirectional mixing mechanism with horizontal wings Number of mixing wings: 4 wings for Φ600 to 1000 mm, 6 wings for Φ800 to 1200 mm, 8 wings for Φ1200 to 1600 mm Standard construction speed: Penetration 1.0 m/min or less, extraction 1.0 m/min or less Number of blade cuts: 450 cuts/m or more
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please download the PDF or feel free to contact us. It is also introduced on our company website.
Detailed information
-
Ground improvement work "T-column method"
-
Construction photos
Company information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential lots, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing comprehensive support from design to municipal responses, as well as construction and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.