Examples of applications for rockfall prevention construction methods: Preliminary works for disaster recovery, etc.
DK Bond Mortar achieves the specified adhesion strength in 7 days! It is a method that allows for immediate commencement of construction.
We would like to introduce examples of applications for the rockfall prevention construction method by Daini Kensetsu Co., Ltd. Our rockfall prevention construction method can be adapted for "preparatory work for disaster recovery," among other uses. For instance, it can be used in situations where immediate effectiveness is desired. It requires no effort for preparatory work or temporary structures, allowing for immediate commencement of construction. DK Bond Mortar can achieve the specified adhesion strength within 7 days of material age. 【Features】 ■ No effort required for preparatory work or temporary structures ■ Immediate commencement of construction possible ■ DK Bond Mortar can achieve the specified adhesion strength within 7 days of material age *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
The construction method described here prevents loosening of the bedrock due to weathering by sealing crack openings and dispersing concentrated stress in the area, making it highly durable against repeated loads such as earthquakes, and demonstrating a strong rockfall prevention effect. The features of this method include: 1. It can be applied to large rocks and high-altitude rocks that have high potential in mountain slopes and similar areas. 2. It can secure natural rock formations in their current state, and the construction traces harmonize with the landscape, making it particularly effective for use in natural parks and scenic areas. 3. Since there are no alterations to the natural features or new structures required, and the construction equipment is minimal, it can be easily combined with other methods.