Low-cost design capabilities that achieve "optimal shapes and reduced number of parts" Practical training Costs will definitely decrease with shape optimization and reduction in the number of parts!
This is a course aimed at enhancing cost-effective design capabilities by developing component information settings (1. Material 2. Processing steps 3. Required specifications 4. Issues) based on VA/VE perspectives. On May 20, 2020 (Wednesday), we will hold a full-day seminar on the above topic, hosted by the Nikkan Kogyo Shimbun. Please check the "News" section for details.
Inquire About This Product
basic information
Purpose of the Event Securing profits through cost reduction activities is a paramount objective in the manufacturing industry. Moreover, implementing cost reductions in the design phase, which is upstream in the manufacturing process, can yield effects that are dozens of times greater than those achieved through cost reduction activities at the shop floor level. By optimizing shapes and reducing the number of parts in design, costs will undoubtedly decrease. In this seminar, we will explain how to advance low-cost design with a focus on optimal shapes and parts reduction, based on VA (Value Analysis) and VE (Value Engineering), using a wealth of drawing samples. Along this line, we will address design troubles by intertwining six perspectives: 1. Processing methods 2. Processing steps 3. Weight reduction 4. Materials 5. Drawings 6. Similar products, and improve QCD (Quality, Cost, Delivery) through optimized design for optimal shapes and parts reduction, leveraging the advantages of 3D CAD in shape recognition. Participants will engage in practical methods and group exercises to learn low-cost design using VA/VE, focusing on advancing designs without excess or waste. Recommended for Young professionals who are committed to cost-reduction-oriented design, those who want to learn about cost-reduction perspectives, and individuals looking to materialize methods for implementing cost reductions and considering horizontal deployment.
Price information
44,000 yen (including tax)
Price range
P2
Delivery Time
※For more details, please contact us.
Applications/Examples of results
Last year, we held two seminars hosted by the Nikkan Kogyo Shimbun. Each time, the theme was cost reduction through VAVE, but the content was varied.
catalog(1)
Download All CatalogsNews about this product(1)
Company information
In the process of improving design, we analyze the entire structure of the equipment, making it possible to solve all issues related to quality, delivery time, and cost. In terms of cost reduction, we achieve an average cost reduction of 40-50% (only applicable to machined products). In our past maximum achievement, we achieved an 80% cost reduction. Our company directly conducts value analysis and improvement design for our customers' equipment.