Examples of all-casing pile extraction construction, including prefabricated piles and cast-in-place piles!
We would like to introduce a case study of our "Pile Extraction (All Casing)" work. First, we use an excavator to expose the tops of the piles, and then we align the casing screw attached to the heavy machinery with the position of the buried piles and cover them with the casing. While rotating, we excavate down to the tip of the pile, perform the cutting of the pile edge, and confirm that the pile is rotating within the casing's soil discharge outlet. Once the edge cutting is complete, the friction is eliminated, and the pile rotation stops. After that, we set a lifting wire at the tip of the buried pile and extract it with a crane. 【Case Study】 ■ Precast Pile Extraction ■ Cast-in-Place Pile Extraction (Nagoya City, φ1500 L=47.0m) *For more details, please refer to the related links page or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the related link page or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related link page or feel free to contact us.
Company information
Meisei Kenzai Co., Ltd. was established in 1988 and has contributed to community development with the motto of "Technology, Safety, and Trust" as a foundation specialist. As experts in earth retention work, we ensure that experienced craftsmen accurately understand the site at all times, making improvements and innovations to provide high-quality technology and peace of mind. We propose construction methods that meet high-quality and safety needs based on established techniques, and we provide total support from design to construction, regardless of various construction conditions.