[Construction Example] T Printing Company Factory in Miyagi Prefecture
We would like to introduce several examples of factories in the industrial zone of Miyagi Prefecture that have been modified using our construction method!
We would like to introduce a case of floor vibration suppression work carried out at the T Printing Company factory located in Miyagi Prefecture. In a factory where a machine weighing approximately 26 tons is placed, the floor began to vibrate after the earthquake. To confirm the situation before the installation of the machine, core drilling was performed at several locations. As a result, it was confirmed that there was a gap of up to approximately 180mm beneath the concrete. By carrying out gap filling work, we were able to restore the original performance of the concrete floor and suppress the floor vibrations. Additionally, we also conducted floor subsidence correction work at a factory of T Industry located in Miyagi Prefecture. 【Case Study】 <Floor Vibration Suppression Work at T Printing Company Factory in Miyagi Prefecture> ■ Construction: (Phase 1) July 2011, (Phase 2) October 2011 ■ Maximum Gap Size: Approximately 180mm ■ Total Construction Area: Approximately 160m2 ■ Actual Working Days: 1.5 days *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
[Case Study] <Miyagi Prefecture T Industry Factory Floor Slab Settlement Correction Work> ■ Construction: (Phase 1) August 2012, (Phase 2) February 2013 ■ Maximum Settlement: Approximately 200mm ■ Total Construction Area: Approximately 600m² ■ Actual Working Days: 8 days *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.