Heiwado Co., Ltd. Takatomiten, Al-Plaza Kameoka 【CoolSarm Construction Examples】
After applying the heat-insulating and thermal-insulating paint "Cool-Sarm" to the roof of the store, we were able to significantly reduce gas and electricity usage. Takatomi Store: Gas usage in summer (August) Before application: 6,155 m³ → After application: 3,507 m³, approximately 43% reduction (September) Before application: 4,938 m³ → After application: 2,915 m³, approximately 40% reduction Al-Plaza Kameoka Store: Electricity usage in summer (July) Before application: 67,465 kW → After application: 60,210 kW, approximately 11% reduction (August) Before application: 75,828 kW → After application: 64,365 kW, approximately 15% reduction
Inquire About This Product
basic information
◆ Heiwado Co., Ltd. Takatomiten Corrugated roof 8,000 m² ◆ Heiwado Co., Ltd. Al-Plaza Kameoka Corrugated roof 8,700 m² * The company has over 30 construction achievements.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
【Usage】 ■ As a heat-insulating and heat-reflective paint for roofs of factories and similar structures. *For more details, please contact us or download the catalog.*
catalog(9)
Download All CatalogsCompany information
Since our establishment, we have been engaged in various maintenance businesses as the exclusive Japanese distributor of excellent building materials from around the world. We aim for high-quality construction that utilizes the technology and know-how we have cultivated over many years while expanding our network of information globally in search of outstanding products. It is our job to always stand in the customer's perspective and respond quickly and accurately to their various needs.