Real-time understanding of project-specific information! Case studies of systems that ensure safety and continuity.
At Tokyo Cartographic Co., Ltd., the existing system was built on a rather old design, leading to challenges in safety and continuity. Therefore, we introduced "Dotto Genka NEO," which eliminates the need for annual switching operations and accommodates the existing business flow as much as possible. After the implementation, there was no need to change the existing business flow or our company's forms and documents, allowing for real-time information by project and the ability to aggregate data for specified periods, making it easier for employees to visualize data. [Challenges] - There were issues with safety and continuity. - Data was sometimes compromised during annual transitions. - The utilization of accumulated data was insufficient, and period-specific aggregation was not possible. *For more details, please feel free to contact us through the related link.
Inquire About This Product
basic information
[After Implementation] ■ Employees can now grasp project-specific information in almost real-time. ■ Through the process of integrating existing workflows into the system, new aggregation perspectives were considered. ■ By clearly distinguishing what the system can and cannot do, we were able to explore incorporating it into operations as much as possible. *For more details, please feel free to contact us via the related link.*
Applications/Examples of results
For more details, please feel free to contact us via the related link.
Company information
The "Dotto Cost Series" has surpassed 5,000 cumulative installations and is the number one cost management package software for the construction industry in Japan. It accommodates the unique business practices of the construction industry and can be linked with major domestic accounting software, attendance management software, and electronic transaction software. It strongly supports the management of construction companies in both streamlining administrative tasks and cost management.