A must-see for design offices! How about a proposal with a new construction method for differentiation?
Compared to steel frame and reinforced concrete construction methods, it allows for shorter construction periods and more affordable proposals. It has been widely adopted in apartments, condominiums, nursing homes, and kindergartens.
The new construction method "CFS method" is a highly durable and earthquake-resistant 2x4 steel house. The 2x4 steel house uses galvanized steel sheets, achieving high durability! It has 1.5 times the strength of wooden panels, while being more cost-effective than RC and heavy steel structures, offering an excellent balance of quality and price. We respond to various requests, such as reducing costs and shortening construction periods for RC and steel structures, or wanting to introduce the CFS method as an alternative to timber. If you have any questions about the introduction of the CFS method or requests for estimates, please feel free to contact us. *For the catalog, please download the PDF or contact us.
Inquire About This Product
basic information
【Features】 ■ Proposals can be made at a lower price compared to RC and heavy steel structures. ■ Wall panels have 1.5 times the strength of wooden 2x4 and high sound insulation. ■ Less prone to creep phenomena, reducing the burden of after-maintenance. ■ High insulation and airtightness due to external insulation. ■ Resistant to termite damage. ■ Prefabricated frame manufacturing allows for reduced construction time and site costs. ■ A construction method that is easy to design! *For more details, please download the PDF or contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or contact us.
Detailed information
-
Anchor bolts are installed in the foundation to secure the panels.
-
The wall panels for the first floor are being transported by Okui Group's trailer and installed with a crane! The work is progressing swiftly.
-
Next, install the floor panels on the second floor after the walls on the first floor.
-
Install the wall on the second floor.
-
This is an image of the floor panel on the second floor as seen from the first floor.
-
We will install the R-level (2nd floor ceiling) floor panels.
-
The roof framing is now complete! If you are newly introducing the CFS method, we can also offer proposals for construction up to this point. We will respond according to your situation, so please feel free to contact us!
catalog(1)
Download All CatalogsCompany information
Our company operates in three divisions: transportation, logistics, and plant machinery construction, as well as in the environmental sector, focusing on thermal insulation painting work. Additionally, we began manufacturing CFS (construction method using steel for two-by-four houses) in February 2018. We offer a wide range of services, including heavy cargo transportation, oversized freight transport, various machinery installation, crane leasing, warehouse logistics, subleasing, thermal insulation painting as an environmental product, and the CFS business as a manufacturing sector. Please feel free to contact us if you have any inquiries.