Remote monitoring and maintenance are also available! Here is an introduction to the work that enabled early identification of issues.
We would like to introduce the work carried out at a 400kW high-voltage power plant located in Kasai City, Hyogo Prefecture. At this power plant, there were continuous abnormal alarms from the plant equipment for several days. Upon investigation, it was determined that the cause was a poor crimping of the internal circuit board, which was recognized as covered by the manufacturer's warranty. Therefore, the existing power conditioner was replaced with a new one. In this case, the power generation company had previously installed remote monitoring devices and outsourced maintenance, which allowed for the early identification of the issue. If such measures are not taken, it is conceivable that the power conditioner could be left inoperative for an extended period, potentially resulting in sales losses ranging from hundreds of thousands to millions. Our company is also capable of providing remote monitoring and maintenance services, so if you have any interest, please feel free to contact us. *For more details, please refer to the PDF document or feel free to reach out to us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Asahi Power Management is committed to discovering new value in all resources and is developing its business accordingly. The value hidden in various resources is referred to as "power," and the essence lies in maximizing it and connecting it to the future. We aim not only to propose new power generation projects to everyone but also to establish business viability and maximize asset value.