No new design calculations required! Construction can be carried out with simpler formwork installation than during concrete pouring.
The "AP Method" is a construction method that involves the "installation of additional walls" with an application range of "expansion," "additional driving," and "opening closure." This method can be designed based on the same design standards as concrete, following the RC/SRC seismic diagnosis criteria and renovation design guidelines. In the case of additional driving walls, no formwork is required, and construction can be carried out while the occupants remain in the building. 【Features】 ■ High compressive strength of 48N/mm² on average ■ No formwork required for additional driving walls ■ Construction can be carried out while occupants remain in the building ■ Design possible based on RC/SRC seismic diagnosis criteria and renovation design guidelines *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Construction Examples and Feedback from the Field】 ■Hotel - There was no need for the transportation of formwork, allowing for parallel construction with other projects. - The use of rubber hoses for pumping did not obstruct the entry and exit of guests, and they could be quickly removed when necessary, ensuring safety. ■Station Building, Department Store, Office - There were no concerns about water leaks affecting pedestrians, lower floors, or computer systems. - Various applications for no-parking zones and neighboring areas were eliminated. ■Hospital - Seismic work was able to be carried out without the need to move large medical equipment. - By placing rubber hoses on the entrance roof, it was easy to consider the needs of entering and exiting patients. ■Research Institute, Factory - The removal of factory piping was minimized, significantly shortening the construction period. - Confidentiality management was made easier. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Applications】 ■Hotels ■Train stations, department stores, office buildings ■Hospitals ■Research institutes, factories *For more details, please refer to the PDF document or feel free to contact us.
Company information
The AP Method Association was established to promote the dissemination of after protection and to improve technology. We conduct manual training sessions for this method, implement practical examinations, and handle the issuance of the "AP Method Construction Qualification Certificate."