Input voltage: AC 180V~250V (50Hz) Input current: 0~5mA Output voltage: DC 2KV~10KV
Model: HVLP-EV-50TA Input Voltage: AC 180V~250V (50Hz) Input Current: 0~5mA Output Voltage: DC 2KV~10KV Output Power: 50W Weight: 0.35KG Appearance Material: Plastic External Dimensions: 240mm*120mm*70mm
Inquire About This Product
basic information
Precautions: 1. The high voltage output line must be away from the 220V input line,and the two cannot be bundled together or close to the cable. 2. The output voltage should not be adjusted to the position of the maximum output voltage for a long time, Need to reserve a certain amount of margin, generally reserve a margin of about 10% to 30%. 3. Two high-voltage output lines cannot be tied together and arranged together, otherwise they will burn out easily.
Price range
Delivery Time
※7~30days
Applications/Examples of results
Oil fume purifier, air purifier, electrostatic dust removal.
Detailed information
-
Appearance Material: Plastic External Dimensions: 240mm * 120mm * 70mm
-
Appearance Material: Plastic External Dimensions: 240mm * 120mm * 70mm
Company information
Anshan Leisheng Electronics Co., Ltd. was established in 2001 and covers an area of 3,000 square meters. Our company employs 80 staff and produces HV rectifiers and HV power supplies. HV products with several advantages Thanks to our years of effort, our 15 research and development engineers have designed a complete series of HV products, including diodes, rectifier blocks, bridge rectifiers, multipliers, and power supplies. These power supplies are used in electrostatic dust collectors, electrostatic powder coating, electrostatic spraying, laser cutting, laser welding, X-ray generators, RF welding machines, and high-cycle machines. The main competitive advantages of our HV power supplies are low ripple, high precision, constant voltage, constant current control, unit PC board control, easy checking, and high stability and reliability. Three QC workers per production line We have a unique QC system that assigns three workers to each production line. We spend 120 hours performing built-in tests, ground tests, and high and low-temperature tests. Please contact us for more details.