Case study of introducing NMR pipe protectors for preventing red rust and extending the lifespan of hotel hot water piping.
At Hotel #RF, which was built 38 years ago, significant red rust corrosion had progressed in the vinyl-lined steel water supply pipes, leading to leaks from the joints. Therefore, the red rust prevention and pipe longevity device "NMR Pipe Protector" was installed. Before the installation of the NMR Pipe Protector, a white filter was attached to the water supply faucet, and after running water for four days, the filter turned brown due to the red rust present in the water supply pipes, revealing that the iron content captured was 40 mg/l, indicating that the red rust corrosion in the pipes was quite advanced. One month after the installation of the NMR Pipe Protector, a white filter was attached at the same location and under the same conditions as before, and the captured iron content decreased to 23 mg/l. After six months of installation, the iron content further decreased to 14 mg/l, and the red rust in the pipes transformed into black rust that does not dissolve in water, demonstrating the rust prevention effect and longevity of the hot water supply pipes. It has been verified that if Hotel #RF continues to use the NMR Pipe Protector, all the red rust in the chilled and hot water supply pipes will change to black rust, allowing for pipe longevity at less than one-fifth the cost of pipe replacement work, extending the pipes' lifespan to that of the building. Naturally, leaks have been completely prevented since then.
Inquire About This Product
Related Videos
basic information
【Introduction Overview】 ■ Location: Miyagi Prefecture ■ Building Overview: 38 years old, 10 stories, 152 rooms ■ Installation Date: May 2011 ■ Installed Piping/Number of Units: Secondary water supply piping from elevated water tank (VLP pipe 100mm)/PT-100DS × 1 unit ■■■■■ Japan System Planning Co., Ltd. ■■■■■ Toll-Free Number: 0120-320-390 <Free Material Request & Inquiries> https://www.jspkk.co.jp/jp/contact/ *For more details, please refer to the PDF materials or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
Over 4,200 installations!
catalog(11)
Download All Catalogs



Company information
~Extending the lifespan of old piping~ "NMR Pipe Protector" Cumulative installation record surpasses 4,400 buildings! (As of July 2025) Among them, over 3,100 buildings are condominiums. = Domestic Achievements = New Chitose Airport Domestic Terminal, JR Sapporo Station (JR Tower Building), Imperial Theatre Building (Tokyo Marunouchi), Yaesu Exit Hall, Famous Bookstore Building (Shinjuku), Hotel Toyokaku (Kyoto), Hotel Serve Shibuya, Shirakagi Care House (Saitama), Kawanishi Private Kushi Elementary School, Food Processing Factory, Major Automobile Manufacturer Factory (Fukuoka Prefecture), Kumamoto Red Cross Hospital, etc. = International Achievements = Buckingham Palace, London City Hall, British Museum, BBC, Christ's College, University of Cambridge, Royal Bank of Scotland, Harrods Department Store, Royal Garden Hotel London, UK Parliament, etc. ★ Featured in the Media "NMR Pipe Protector" ★ Selected as one of the top 10 rust prevention technologies in the world in 2020 and introduced in a U.S. magazine! Case studies and customer testimonials have been featured in many media outlets, including TV Tokyo's "World Business Satellite (WBS)", TOKYO MX's "Corporate Spirit", and specialized newspapers "Condominium Management News" and "Air Conditioning Times".