Introduction of the roller rocker assembly machine.
The cylinder head is automatically transported and the roller rockers are assembled. Before assembly, the top surface of the head is inspected using images, and a check for missing stem end caps is conducted. <Specifications> Number of assembly points: 16 Cycle time: 54 seconds (including 10 seconds for loading and unloading) Transport height: 860 mm Equipment size: Depth 3000 mm × Width 1260 mm × Height 1660 mm (Total length of the transport section is 1000 mm) Primary air: 0.3 MPa 3/8 Primary power supply: 200V 7.9 KVA
Inquire About This Product
basic information
For more details, please contact us through our website.
Price range
Delivery Time
Applications/Examples of results
For more details, please contact us through our website.
Company information
Since its establishment, Shinmei Industrial Co., Ltd. has expanded its business by providing high-quality, low-cost production lines and comprehensive car services, including vehicle maintenance, bodywork, and restoration of classic cars. We aspire to achieve further growth with a long-term perspective and rich creativity, always being a company that is trusted and expected by our customers. Based on our unique technologies and products, we continuously envision the "future" and take on challenges for the next generation. Moving forward, we will prioritize compliance in our corporate activities, cherish our customers' "hearts," and contribute to harmonious development with society through the provision of various products via innovative manufacturing in a wide range of industries, including the automotive sector, as well as supporting our customers' comfortable car lives.