Measures to extend the life of aging social infrastructure!
■To prevent the deterioration of concrete structures! ■Reinforced existing bridges damaged by salt damage and other factors while in use. ■Renewed the bridge with minimal traffic restrictions!!
Inquire About This Product
basic information
This is a method of renewing the bridge structure by installing a PCaBOX under the damaged bridge and further integrating the space between the bridge and the BOX with filling material.
Price range
Delivery Time
Applications/Examples of results
【Achievement DATA】 ■ Uta Elevated Bridge Construction Period: Late November 2013 to Late July 2014 Construction Length: 303.8m Product Specifications: Large Precast Box Culvert (2-part type) B5500×H3200 45 sets, B5500×H2600 36 sets B5500×H2700 75 sets, BB5500×H3400 51 sets ■ Benten Ohashi Bridge Construction Period: (Product Construction) July 2017 to November 2018 Product Specifications and Construction Length: (2-part) No. 11 5.0×5.0 11m (4-part) No. 9 & 10 7.0×4.0 50m, No. 2, 6, 7, & 8 7.0×4.5 103m, No. 3 & 5 7.0×5.0 48m, No. 1 & 4 7.0×5.5 54m
Company information
Our company, under the belief of contributing to society through the development of social infrastructure, constantly strives for quality improvement and technical advancement. With the conviction that business is about people, we respect humanity, engage in talent development and fair personnel practices, and cultivate a free and open corporate culture. We aim to deepen mutual understanding and trust, working together towards the development of the company and the enhancement of welfare, while concentrating all our efforts on stabilizing and expanding our management foundation.