Leaving the old roofing materials as they are, a new roof was installed! A case study where the roof was completed in just 2 days.
We would like to introduce a case study of the cool metal roofing material eligible for carbon offset that our company handles, the "Eco Cover Roof / Eco Cover Method," which was installed on a factory roof. Removing old slate roofs that are likely to contain asbestos is difficult and requires significant costs. However, in such cases, using our method can reduce costs, construction time, and various risks. Additionally, the cover method minimizes the processes that would require stopping factory operations, which often occur during re-roofing or painting work. Excluding wiring work after the roof installation, this factory completed the construction in two days. Since the factory's operations did not need to be halted during the work, the client was very pleased. [Case Overview] ■ Installation Location: Factory Roof ■ Product Used: Oonami Gray ■ Construction Effect: A new roof was installed while leaving the old roofing material in place. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
The Alps have nurtured technology in pursuit of a delicate style that harmonizes with the Japanese climate and fits more modern buildings, as well as a heavy style that invites a deeper sense of history. Considering the emotions of Japan left by the times, such as roof tiles, we will create a new Japanese roof for the homes of today and the next generation.