A case where a one-way flow from the acceptance of raw materials to the shipment of products has become possible.
Here is an example of a new construction project for a food factory. This factory manufactures and supplies bento boxes to convenience stores. Due to the ample space of the site, all production facilities were able to be placed on the first floor. As a result, the manufacturing rooms were arranged to accommodate receiving, storage, preprocessing, processing, plating, and sorting, allowing for a one-way flow from the receipt of raw materials to the shipment of products. [Project Overview] ■ Location: Fukuoka Prefecture ■ Structure: Steel structure, 2 stories above ground ■ Area: 8,346.56 m² ■ Completion Year: 2010 *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
The Food Facility Planning Research Institute Co., Ltd. conducts consulting services for management guidance and certification acquisition related to food safety management, such as HACCP, ISO 22000, and SQF 2000, along with hard aspects of planning, designing, and managing food facilities. Please feel free to contact us when you need our services.

