[Performance Introduction] Lubricating Oil Factory Equipment Modification Plan Due to Change of Oil Type - Construction
We will introduce a case where we minimized the customer's burden necessary for considering changes in the operation of lubricant manufacturing equipment and carried out the design and construction!
We received a request to repurpose an idle waste oil tank into a product tank in order to make effective use of existing facilities and factory premises. Additionally, while the scope of modifications involves various aspects such as machinery, civil engineering, electrical work, and control systems, there is no flexibility to allocate additional human resources, so the request was to carry out the work with the current structure. We proposed the necessary considerations and carried out the design and construction. If you are a customer who wants to "increase productivity by effectively utilizing the current manufacturing facilities despite various constraints on the premises," please feel free to contact us. 【Construction Details】 ■Modification work associated with changing the type of oil in the existing tank →Conversion of the existing waste oil tank into a product tank ■New construction of a shipping line from the repurposed product tank ■Modification of the control system (hardware/software) due to the alterations *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Features of this Case】 <Customer Requests> ■ We want to repurpose the waste oil tank into a product tank to make effective use of existing facilities and factory premises. ■ We do not have the capacity to allocate additional human resources, so we would like to proceed with the current structure. <Our Proposal> ■ Conduct equipment review and modification work for the tank due to the change in contents (confirm compliance with fire safety laws related to the change from Class 4 to Class 3 petroleum products, and modifications to level gauges). ■ Establish a project structure and proceed with specification confirmation of existing equipment in collaboration with the on-site personnel. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
By leveraging my experience as a user, I will contribute to the utilization of low-cost, high-efficiency, and clean equipment by responding to various customer needs regarding equipment. Additionally, I will fulfill our corporate social responsibility and strive to maintain and improve the natural environment.