We solve our customers' problems with cutting-edge 3D measurement equipment and proprietary processing technology.
By using the latest 3D measurement equipment to comprehensively handle everything from equipment renewal planning, equipment layout considerations, detailed design, to construction, the planning process can proceed efficiently.
The top priority in plant construction is the initial design phase. Let us help you shape your vision. We propose optimal plans for customers considering plant construction focused on production lines and the introduction of production equipment. The process of plant construction includes Engineering (design), Procurement (procurement), Construction, and Commissioning (trial operation adjustment). We are a company that can handle everything from design to trial operation adjustment in-house. <Our Strengths> Utilizing 3D information to visualize various scenes - Design and construction considerations using 3D (3D CAD) laser measurement - Advanced design management through data linking with P&ID - Improved completion through design walkthroughs - Automatic output of construction drawings and procurement lists from 3D design - Pre-simulation of construction processes - On-site layout review using AR devices - Accurate progress management with a 3D (process, quantity, labor) construction management system Please feel free to contact us. We will provide you with detailed explanations.
Inquire About This Product
basic information
Are you facing any of the following issues when planning plant construction or renovation? We are here to help you. - Unable to grasp the image of the construction process (EPC + C) - Lack of resources within the company to plan plant construction - Want to entrust everything from design to construction, including building construction and manufacturing line equipment, to a single company - Lack of drawings or documentation of existing equipment when preparing for budgeting - Want to confirm the image of the completed plant before or during construction
Applications/Examples of results
The main examples are listed below. Details of the examples will be provided upon inquiry.
Detailed information
-
Tei S Tech Co., Ltd. Hamamatsu Factory ■ Building construction work and associated works set
-
Marubishi Oil & Chemical Industry Co., Ltd. Nabari Factory ■ Responding to new factory production equipment with EPC
-
To Konan Utility Co., Ltd. ■ Construction of wood biomass power generation facilities through EPC.
-
To the Electric Wire Manufacturing Company: ■ We provide EPCC services from high-voltage receiving and transforming equipment to substation equipment, "unconstrained by manufacturers."
-
Tei S Tech Co., Ltd. Saitama Factory ■ Construction of a new sheet factory and ancillary facilities
Company information
In the energy sector, we are expanding our business in a wide range of areas, including industrial self-generation facilities, clean energy such as solar and biomass, next-generation energy like hydrogen, and in the industrial sector, the construction of manufacturing plants in the pharmaceutical, food, and chemical fields, as well as the latest systems such as IoT and DX. Based on our solid technological capabilities, we will continue to grow and develop as a company that is widely trusted and chosen both domestically and internationally, by accurately responding to our customers' needs with our technology and quality.