Design, planning, and estimates according to usage conditions! It is possible to easily and reliably supply water to high floors.
The water supply for shield tunnel construction is ideally suited for the rational "Free Step Pump." The gradient of the tunnel, the depth of the shaft, and the required water volume in the tunnel vary depending on the construction conditions, so comprehensive planning and design are necessary. Additionally, with the increase in high-rise construction, it can accommodate any height of temporary water supply systems. All piping (ladder hoses) and valve units are provided for rent, contributing to a zero-mission approach by leaving no waste on site after use. 【Features】 <Free Step Pumping System for Super High-Rise Buildings> ■ Developed to accommodate any height of temporary water supply system ■ All piping (ladder hoses) and valve units are provided for rent ■ Contributes to a zero-mission approach by leaving no waste on site after use *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
Related Videos
basic information
【FP Series Lineup (Partial)】 ■FP-510 ■FP-516 ■FP-106 ■FP-155 ■FP-1012 ■FP-1510 *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Usage】 ■ Water supply for shield and tunnel construction ■ Water supply to high-rise floors *For more details, please refer to the PDF document or feel free to contact us.
Company information
Our company plans and designs production factories and industrial water treatment facilities, handling the entire water treatment process including delivery, installation, trial operation, and maintenance services after startup. We also offer rental and sales of water treatment equipment for industrial and public facilities, and since our founding, we have continued to focus exclusively on the water treatment field. Please feel free to contact us if you have any inquiries.