[Metal Road Construction Method Case Study] Miyagi Prefecture, New Road Construction Project for Onagawa Dejima Line Town Road
Hand-stretched construction using plate pressing is possible! An example from the "Dejima Bridge Project" connecting the mainland and remote islands.
Here is an example of the "Metal Road Construction Method" in Onagawa Town, Oshika District, Miyagi Prefecture. This method was adopted as part of the road construction project on the mainland side of the "Dejima Bridge Project," which connects the mainland to the islands. The construction site is surrounded by the sea and has access from only one direction, which was appreciated for allowing hand-extended construction with a single push. Additionally, due to its coastal location, the design takes into account aesthetics and corrosion prevention. 【Case Overview】 ■ Client: Onagawa Town, Miyagi Prefecture ■ Total Length: 90.0m ■ Width: 7.7m ■ Number of Piles: 90 ■ Weight of Steel Pipe Piles: 152.8t ■ Weight of Girders: 428t *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
JFE Civil Corporation has been developing its business in various fields based on its achievements and technical capabilities in maintaining JFE Steel's steelworks for many years. We deliver valuable business from planning to construction and maintenance support. We are the only general construction company in the JFE Group.