Over 1,300 achievements nationwide! No need for pile driving, formwork, or foundation work.
At Yoshimitsu Corporation, we carry out ground improvement to create artificial bedrock suitable for buildings on weak ground across the country. Compared to pile foundations, we achieve approximately 30% cost reduction. Since pile work, formwork work, and ground preparation work are not required, the construction period is shortened by 50%. Please feel free to contact us when you need our services. 【Features】 ■ Approximately 30% cost reduction compared to conventional methods (pile foundation) (for a total floor area of 1000 m² and pile length of 30 m) ■ Construction period shortened by 50% compared to conventional methods, as pile work, formwork work, and ground preparation work are not required (for a total floor area of 1000 m² and pile length of 30 m) ■ No piles are used, which also reduces demolition costs when dismantling the building *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
【Recommended for the following】 ■ Design offices ■ General contractors ■ Companies that need commercial stores or logistics warehouses ■ Clients planning factories, warehouses, or stores on weak ground requiring pile foundations *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■Alternative to pile foundations in construction *For more details, please refer to the related links or feel free to contact us.
Company information
We have been in the construction business for over 100 years, based in Ishikawa Prefecture.