No use of piles! Introducing the features of the TNF method, which can also reduce demolition costs during building demolition!
We would like to introduce the features of the "TNF Method," implemented by Yoshimitsu Corporation, which has over 1,300 successful projects nationwide. We carry out ground improvement to create an artificial bedrock suitable for buildings on soft ground across the country. Since we do not use piles, the demolition costs during building dismantling are also reduced. Please feel free to contact us when you need our services. 【Features】 ■ Approximately 30% cost reduction compared to conventional methods (pile foundation) (for a total floor area of 1,000 m² and pile length of 30 m) ■ Construction period shortened by 50% compared to conventional methods, as pile work, formwork work, and ground preparation work are not required (for a total floor area of 1,000 m² and pile length of 30 m) *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
【Recommended for the following】 ■ Design offices ■ General contractors ■ Companies that need commercial stores or logistics warehouses ■ Clients planning factories, warehouses, or stores on weak ground requiring pile foundations *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■Alternative to pile foundations in construction *For more details, please refer to the related links or feel free to contact us.
Company information
We have been in the construction business for over 100 years, based in Ishikawa Prefecture.