[Construction Case] Correction Work for Settlement of Logistics Warehouse - Step Adjustment
"Due to the formation of a step in the floor, a ramp was installed." "The floor has settled, causing cracks." Resolved with the up-construction method.
This time, we will introduce a construction case of a logistics warehouse in Niigata Prefecture. In this logistics warehouse, unevenness and cracks occurred in the floor slab due to ground subsidence, which hindered the movement of carts and operations. The Upcon method allows for construction to be carried out without stopping operations and within a short construction period. Additionally, during the polyurethane resin injection, a surveyor is present at all times to manage the floor level in millimeter increments, ensuring a high-quality finish. 【Site Information】 Niigata Prefecture / Logistics Warehouse Construction Area: 1,148 square meters Maximum Subsidence: 71mm Construction Period: 8 days
Inquire About This Product
basic information
■ What is the Upcon Method? The Upcon method involves drilling small holes with a diameter of 16mm into existing concrete floors that have experienced sinking, unevenness, tilting, or gaps. While continuously monitoring the level in millimeter increments, polyurethane resin is injected. The resin injected beneath the floor expands rapidly under pressure, compacting and strengthening the ground, improving bearing capacity, and lifting the concrete back into position. The final strength of the resin is achieved in about 60 minutes. Additionally, if gaps have formed beneath the floor, they can be filled using the same method. *The polyurethane can lift the floor with a foaming pressure of up to 10 tons per square meter, eliminating the need to move heavy equipment or goods. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 that of conventional methods. 2. No interruption of operations: There is no need to move rack equipment or products. 3. Comprehensive high technical capability: Responsible construction by 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-sinking compared to conventional methods. We provide total support from on-site investigation to repair planning and construction, all handled responsibly by our in-house staff. Our specially trained and experienced staff will propose the optimal repair plan tailored to your site.
Price range
Delivery Time
Applications/Examples of results
■Doma floor subsidence correction work ■Doma floor void filling work
catalog(4)
Download All Catalogs![[Construction Case Study/Warehouse Edition Vol. 3] Correction of Floor Settlement in Logistics Center (Step Correction)](https://image.mono.ipros.com/public/catalog/image/01/440/691142/IPROS92327252784948285479.jpeg?w=120&h=170)
![[Construction Case Study/Warehouse Vol.2] Settlement Correction Work for Automobile Manufacturer's Office and Parts Storage](https://image.mono.ipros.com/public/catalog/image/01/d82/644772/IPROS41981554215493828964.png?w=120&h=170)
![[Construction Case Study/Warehouse Vol. 1] Subsidence Correction and Void Filling Work for Warehouse and Factory](https://image.mono.ipros.com/public/catalog/image/01/d17/644938/IPROS68258418151929232212.jpeg?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.