Red rust is converted into black rust with one-tenth the volume! A case where the red rust problem was solved by implementing it for less than one-twentieth of the cost.
This property is 12 years old and uses vinyl-lined steel pipes (VLP) for the water supply pipe joints. The estimated cost for future renovation work to replace them with stainless steel pipes as a measure against future red rust blockage is expected to exceed 100 million yen per building. Additionally, when measuring the red rust blockage rate at the dissimilar metal joints of the kitchen water supply pipes in two units, the rates were found to be 77.5% and 37.3%. By introducing the "NMR Pipe Protector" at a cost of less than one-twentieth of that, the red rust issue was resolved. After 12 months of installation, the red rust blockage rates significantly decreased to 60.0% and 31.0%, and prevention of red rust and the occurrence of black rust were confirmed. [Effects After Installation] - After 12 months of installation, the red rust blockage rates significantly decreased to 60.0% and 31.0%, confirming the prevention of red rust and the occurrence of black rust. - After 27 months of installation, it was confirmed that the red rust had transformed into black rust, with a volume reduction to one-tenth, showing rates of 58.5% and 23.3%. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
Related Videos
basic information
【Introduction Overview】 ■Building Name: Hiroo Garden Hills G, H, I, J, K Buildings ■Location: Hiroo, Shibuya-ku, Tokyo ■Building Overview: 12 years old, 15-story reinforced concrete apartment building ■Water Supply Method: Pressurized Pump System ■Installation Date: August 27, 1997 ■Installed Piping/Number of Installations ・Secondary Side Piping for Water Meter (VLP Pipe 100mm)/PT-100DS×2 Sets ・Secondary Side Water Supply Piping for Pressurized Pump (VLP Pipe 65mm)/PT-75DS×5 Sets *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(5)
Download All Catalogs
Company information
~Extending the lifespan of old piping~ "NMR Pipe Protector" Cumulative installation record surpasses 4,400 buildings! (As of July 2025) Among them, over 3,100 buildings are condominiums. = Domestic Achievements = New Chitose Airport Domestic Terminal, JR Sapporo Station (JR Tower Building), Imperial Theatre Building (Tokyo Marunouchi), Yaesu Exit Hall, Famous Bookstore Building (Shinjuku), Hotel Toyokaku (Kyoto), Hotel Serve Shibuya, Shirakagi Care House (Saitama), Kawanishi Private Kushi Elementary School, Food Processing Factory, Major Automobile Manufacturer Factory (Fukuoka Prefecture), Kumamoto Red Cross Hospital, etc. = International Achievements = Buckingham Palace, London City Hall, British Museum, BBC, Christ's College, University of Cambridge, Royal Bank of Scotland, Harrods Department Store, Royal Garden Hotel London, UK Parliament, etc. ★ Featured in the Media "NMR Pipe Protector" ★ Selected as one of the top 10 rust prevention technologies in the world in 2020 and introduced in a U.S. magazine! Case studies and customer testimonials have been featured in many media outlets, including TV Tokyo's "World Business Satellite (WBS)", TOKYO MX's "Corporate Spirit", and specialized newspapers "Condominium Management News" and "Air Conditioning Times".