New leaks after installation are completely prevented! Costs can be reduced to less than one-tenth, extending the building's lifespan!
At Hospital #H, which was built 48 years ago, the air conditioning chilled and warm water piping using galvanized steel pipes (SGP) has experienced significant deterioration due to red rust, leading to leaks. Therefore, a red rust prevention piping extension device, the "NMR Pipe Protector," was installed. Before installation, a sample of the circulating chilled and warm water was taken, revealing a total iron concentration of 2.5 mg/l, indicating that red rust corrosion was progressing within the piping. Four weeks after the installation of the product, a subsequent water sample showed a significant reduction in total iron concentration to 0.4 mg/l. A water sample taken six years after installation showed an even further reduction to 0.2 mg/l, confirming that the progression of new red rust within the chilled water piping had completely stopped. The existing red rust had transformed into an insoluble, passive black rust with a volume reduced to one-tenth. [Introduction Overview] ■ Hospital Location: Hamamatsu City, Shizuoka Prefecture ■ Hospital Overview: 41 years old, 2 basement levels and 9 above-ground floors with 606 beds ■ Installation Date: December 2013 *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
[Installed Piping/Number of Installations] ■ Air conditioning chilled and hot water secondary (supply) header secondary side chilled and hot water supply pipe (SGP pipe 250mm)/PT-250DS×1 unit ■ Air conditioning hot water secondary (supply) header secondary side hot water supply pipe (SGP pipe 250mm)/PT-100DS×2 units ■ Others, 1st and 2nd building water lifting and supply system PT-150DS to 75DS×6 units *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(5)
Download All Catalogs
Company information
~Extending the lifespan of old piping~ "NMR Pipe Protector" Cumulative installation record surpasses 4,400 buildings! (As of July 2025) Among them, over 3,100 buildings are condominiums. = Domestic Achievements = New Chitose Airport Domestic Terminal, JR Sapporo Station (JR Tower Building), Imperial Theatre Building (Tokyo Marunouchi), Yaesu Exit Hall, Famous Bookstore Building (Shinjuku), Hotel Toyokaku (Kyoto), Hotel Serve Shibuya, Shirakagi Care House (Saitama), Kawanishi Private Kushi Elementary School, Food Processing Factory, Major Automobile Manufacturer Factory (Fukuoka Prefecture), Kumamoto Red Cross Hospital, etc. = International Achievements = Buckingham Palace, London City Hall, British Museum, BBC, Christ's College, University of Cambridge, Royal Bank of Scotland, Harrods Department Store, Royal Garden Hotel London, UK Parliament, etc. ★ Featured in the Media "NMR Pipe Protector" ★ Selected as one of the top 10 rust prevention technologies in the world in 2020 and introduced in a U.S. magazine! Case studies and customer testimonials have been featured in many media outlets, including TV Tokyo's "World Business Satellite (WBS)", TOKYO MX's "Corporate Spirit", and specialized newspapers "Condominium Management News" and "Air Conditioning Times".