Case Study on the Introduction of a Prefabricated Flood Prevention Wall System Suitable for Flood Control in Condominiums
A wide waterproof width is available with the maximum span! A lightweight aluminum alloy disassemblable easy assembly system.
We would like to introduce a case study on the implementation of the "IBS Modular Flood Prevention Wall System" in a condominium parking lot. Typical waterproof walls cannot be easily removed once assembled, and the introduction of waterproof stop boards in condominium parking lots needs to consider the residents' ability to use the parking area. If the foundation strength is sufficient, a self-supporting center post that does not require back support can be standardly selected for flood heights of approximately 4.0m, allowing for quick assembly. 【Case Overview】 ■ Installation Location: Condominium Parking Lot ■ Installed Product: IBS Modular Flood Prevention Wall System ■ Implementation Effect: Can be assembled in a short time *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
M&K Co., Ltd. is a trading company that connects the world with users and handles excellent high-performance, high-functionality, and highly reliable products that are beneficial to the industrial sector.