We will install stainless steel piping with excellent long-term durability, or SGP piping with excellent rigidity!
We would like to introduce a case study of roof snow melting (hot water type, exposed method) for detached houses. For existing houses with new finishing materials or stainless steel sheet metal on the roof, the exposed method is suitable if you only wish to melt snow in specific areas. We manufacture fixed brackets according to the working width of the finishing materials and arrange stainless steel piping, which has excellent long-term durability, or SGP piping, which has excellent rigidity. Compared to the concealed method, the atmospheric radiation from the surface of the snow melting pipes is greater, so it is necessary to increase the temperature of the circulating liquid, which tends to increase fuel consumption by about 10%. 【Case Overview】 ■ Tokamachi City, Niigata Prefecture ■ Kerosene boiler ■ 134m² *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
Hokuyetsu Yuki Snow Melt Co., Ltd. is a company located in Tokamachi City, Niigata Prefecture, engaged in roof snow melting, road surface snow melting, and floor heating construction. Our snow melting business was established in 1981 in this region known for its heavy snowfall. Since May 1, 2001, we have started as a specialized company supporting "peace of mind in winter living." For roof snow melting, road surface snow melting, and floor heating, please leave everything from design and construction to maintenance to us.