The heat source unit that was replaced a few years ago is still in use! An example where the entire roof has started to melt evenly.
We would like to introduce a case study of roof snow melting (hot water type, concealed method) installation. We received a consultation from a quiet hot spring inn that is usually hit by over 2 meters of heavy snow each year, stating, "The roof snow melting system installed over a decade ago is not working well, and despite consuming a lot of fuel, it is not melting effectively. We would like some assistance." The heat source unit that was replaced a few years ago will continue to be used, but almost everything else, including panels, copper pipes, supply pipes, and controls, will be replaced. As a result, the entire roof has started to melt evenly, leading to a resolution of the issue. 【Case Overview】 ■ Nagaoka City, Niigata Prefecture ■ Kerosene boiler ■ 607m2 *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
Hokuyetsu Yuki Snow Melt Co., Ltd. is a company located in Tokamachi City, Niigata Prefecture, engaged in roof snow melting, road surface snow melting, and floor heating construction. Our snow melting business was established in 1981 in this region known for its heavy snowfall. Since May 1, 2001, we have started as a specialized company supporting "peace of mind in winter living." For roof snow melting, road surface snow melting, and floor heating, please leave everything from design and construction to maintenance to us.