[Case] Suginami Ward Office, Tokyo
Due to the renovation work at the parking lot entrance, our representative will explain the background and key points of the case involving the waterproof board introduced by Suzuki Shutter at the Suginami Ward Office. <Overview> - Installation site: Suginami Ward Office - Location: 1-15-1 Asagaya Minami, Suginami-ku, Tokyo - Installation location: Entrance to the underground parking ramp at Suginami Ward Office - Flood risk around the installation site: Less than 0.1m - Product introduced: Removable waterproof board "Apia Shut" *Please refer to the PDF document for more details.
Inquire About This Product
basic information
At Suzuki Shutter Co., Ltd., our staff conducts on-site surveys to propose the best flood prevention measures for our customers. In addition to developing, manufacturing, selling, and installing waterproof boards in-house for many years, we also offer comprehensive aftercare services such as regular inspections and maintenance. To protect your valuable corporate assets from flood damage, please feel free to consult with us first.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsNews about this product(1)
Company information
We, Suzuki Shutter, as a manufacturer specializing in shutters, respond to diverse needs and continuously improve our current products while striving to create more comfortable living spaces through research and development of new products. Additionally, we are fully committed to supporting safety and security in various scenarios through our efforts in disaster prevention products, leveraging the know-how we have cultivated over the years. On April 3, 2023, thanks to your support, Suzuki Shutter Co., Ltd. celebrated its 120th anniversary. (Special website now available)