Expansion between the old law and the new law! Key points include the relationship with existing structures, equipment for chilled manufacturing zones, and architectural specifications.
We would like to introduce a case study of a factory that manufactures cooked noodles, which we designed. The manufacturing process involves storing raw materials on the first floor, transporting them to the upper floors, producing noodles on the third floor, boiling them on the second floor, adding toppings, and sorting them on the first floor, creating a flow of "from bottom to top" and "from top to bottom." The relationship with existing structures, the equipment for chilled production, and architectural specifications were key points in the design. [Overview] ■ Location: Kawagoe City, Saitama Prefecture ■ Client: Musashino Co., Ltd. ■ Construction ・Architecture: Ishikawa Construction ・Equipment: Fujita Engineering ■ Structure and Scale: Steel structure, 4 stories above ground *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
The Food Facility Planning Research Institute Co., Ltd. conducts consulting services for management guidance and certification acquisition related to food safety management, such as HACCP, ISO 22000, and SQF 2000, along with hard aspects of planning, designing, and managing food facilities. Please feel free to contact us when you need our services.