Efficient construction is also possible! Introducing examples of underground obstacle removal conducted under power lines.
We would like to introduce a case study of underground obstacle removal work carried out by our company. In Adachi Ward, Tokyo, we conducted underground obstacle removal work under a power line. Using the SR-45 multi-drill excavator with a low clearance middle mast specification, we were able to remove underground obstacles such as underground pits, firewater tanks, and pile removals in sites with overhead restrictions. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work with Overhead Restrictions ■ Construction Date: February 6, 2023 ■ Location: Adachi Ward, Tokyo *For more details, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
Company information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential lots, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing comprehensive support from design to municipal responses, as well as construction and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.