We can also handle wall-side construction in the city! Examples of efficient and safe removal are available.
We would like to introduce a case study of underground obstacle removal that our company has conducted. This involves the removal of a Φ1000 underground structure in Nihonbashi Bakurocho, Tokyo. Using our original Kelly grab developed in-house, we can carry out the removal efficiently and safely. We have provided images of this case in the related links, so please take a look. 【Case Overview】 ■ Project Name: Removal of underground structure using our in-house developed Kelly grab ■ Construction Date: December 21, 2022 ■ Location: Nihonbashi Bakurocho, Tokyo ■ Details: Removal of Φ1000 underground structure *For more details, please download the PDF from the related links or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
Company information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential lots, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing comprehensive support from design to municipal responses, as well as construction and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.