Introducing a case study using our original in-house developed tool, the special Kelly grab!
Here is an introduction to a case study of underground obstacle removal conducted by our company. Construction work at the wall edge in Nihonbashi Bakurocho, Tokyo. The site conditions are in a narrow area within the city. We carried out the removal of the existing structure using the SR-45 multi-drill excavator and employed our original tool, the special Kelly grab. 【Case Overview】 ■ Project Name: Wall Edge Construction Using SR-45 Original Kelly Grab ■ Construction Date: December 14, 2022 ■ Location: Nihonbashi Bakurocho, Tokyo ■ Details: Φ1000 L=3.5m, 15 locations *For more details, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
Company information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential lots, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing comprehensive support from design to municipal responses, as well as construction and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.