[Construction Case] Removal of Existing Foundation Piles in an Extremely Narrow Site of Approximately 56m2
Numerous achievements in construction on narrow sites and along walls! We will introduce examples of construction using the multi-drill method.
We would like to introduce a case study of underground obstacle removal conducted by our company. In Kojimachi, Chiyoda Ward, Tokyo, we carried out the removal of existing foundation piles on a site of approximately 56m², which is extremely small. The machinery used was the SR-45, and the construction was performed using the multi-drill method. The multi-drill allows for construction in extremely narrow sites where buildings are closely packed together. For more details about this case, please check the related links. 【Case Overview】 ■ Project Name: Removal of existing foundation piles on a site of approximately 56m² ■ Construction Date: September 5, 2022 ■ Location: Kojimachi, Chiyoda Ward, Tokyo ■ Details: Φ1000 L=19.0m, 3 locations *For more information, please download the PDF from the related links or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
Company information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential lots, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing comprehensive support from design to municipal responses, as well as construction and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.