We will perform cutting, removal, and backfilling suitable for the site! A case of removing PHC piles that could not be completely taken out.
Here is an introduction to a case study of underground obstacle removal conducted by our company. In Yokosuka City, Kanagawa Prefecture, we executed the work using the multi-drilling method (equivalent to BG method). We removed PHC piles that could not be extracted using the pull-out method. Upon receiving notice that extraction was impossible, we promptly began the work and successfully completed the project. 【Case Overview】 ■ Project Name: Multi-Drilling Method (Equivalent to BG Method) ■ Construction Date: May 12, 2022 ■ Location: Yokosuka City, Kanagawa Prefecture ■ Details: φ1000 GL-25m *For more details, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
Company information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential lots, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing comprehensive support from design to municipal responses, as well as construction and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.