We have a track record of construction in various fields! We can cut, remove, and backfill underground obstacles using various methods suitable for the site.
On our company website, we introduce case studies of underground obstacle removal. This page features a special report on underground obstacles that were removed in March 2022. For more details, please refer to the related links. Our company is capable of cutting, removing, and backfilling underground obstacles using various methods suitable for the site. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
Company information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential lots, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing comprehensive support from design to municipal responses, as well as construction and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.