Strong performance in narrow and low sites! Case study using the multi-drill rig MD250.
We would like to introduce a case of underground obstacle removal conducted by our company. In Jujo, Kita-ku, Tokyo, we performed underground obstacle removal work using the multi-drilling method inside an existing soundproof house with a ceiling height of 11.6m. We used the multi-drill excavator MD250 to carry out the removal at a low headroom. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work inside Soundproof House ■ Construction Date: December 9, 2019 ■ Location: Jujo, Kita-ku, Tokyo *For more details, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
Company information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential lots, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing comprehensive support from design to municipal responses, as well as construction and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.