Lifted using the multi-drill method! A case of removing obstacles made of hard machi stone.
We would like to introduce a case of underground obstacle removal that we conducted. In a site adjacent to the Shuto Expressway in Chuo Ward, Tokyo, we removed a hard block of rubble that had been left under the old revetment. Using the multi-drill excavator SR-45, which has the capability to remove obstacles even in adjacent areas, we lifted the rubble using the multi-drill method. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Project in Chuo Ward, Tokyo ■ Construction Date: October 12, 2020 ■ Location: Nihonbashi Hamacho, Chuo Ward, Tokyo *For more details, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
Company information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential lots, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing comprehensive support from design to municipal responses, as well as construction and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.