[Construction Case] Chuo Ward, Tokyo, Nihonbashi - Underground Obstacle Removal Work in a Narrow Site
Achievements in responding to diverse site conditions! Here is an example of removing obstacles such as sleepers located 10 cm from the wall.
We would like to introduce a case of underground obstacle removal that we conducted. In Nihonbashi, Chuo Ward, Tokyo, we received a request for the removal of underground obstacles located 10 cm from an adjacent wall. It was a site with limited space for wall construction, but we used the multi-purpose pile driving and extraction machine MD250 to remove old obstacles such as railway sleepers. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Project in a Limited Space, Nihonbashi, Chuo Ward, Tokyo ■ Construction Date: May 15, 2021 ■ Location: Nihonbashi, Chuo Ward, Tokyo *For more details, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
Company information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential lots, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing comprehensive support from design to municipal responses, as well as construction and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.