The leader length can be freely adjusted according to the height above the ground! Here are some examples using the MD250.
We would like to introduce a case of underground obstacle removal conducted by our company. In Inagi City, Tokyo, we carried out underground obstacle removal work due to low overhead clearance. The removal work is being performed using the MD250. By changing the length of the leader, it becomes possible to carry out underground obstacle removal work even under such low power lines. 【Case Overview】 ■ Project Name: Inagi Enokido Underground Water Pipe Removal Project ■ Construction Date: August 17, 2021 ■ Location: Inagi City, Tokyo *For more details, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
Company information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential lots, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing comprehensive support from design to municipal responses, as well as construction and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.