Grandpa Fubi teaches the Fubi course: I will clearly explain about Fubi maintenance and management.
I am Fushi the old man. I am a cross pipe laid under the railway to flow agricultural water when the railway was constructed. I was born in 1905 and I am currently 113 years old. I was born and raised in Nagano Prefecture. I will talk about the overview of Fushi.
Inquire About This Product
basic information
I am an old man named Fushi. In my younger days, I supported heavy vehicles and tracks from below the tracks with all my strength, but as I grew older, I became a nuisance by causing blockages and digging large holes beside the tracks. In the first year of FCR (1997), I was advised by JR to undergo a health check-up, and I requested an FCR technician to conduct it. First, they created a medical record (individual data) and organized my resident registration (ledger) (FCR primary survey). Next, they cleaned the pipes and examined the inside with a camera (FCR dredging and camera inspection). It turned out that there were cracks in the pipes, misalignments, blockages, and even some that were about to collapse. The next day, the FCR technician proposed the latest Anti-aging (FCR liner method) surgery. It was explained that they would create an FRP pipe on-site inside the existing pipe. There was no need for hospitalization, and it would only take 8 hours of surgery to restore my health. Two weeks later, I underwent that Anti-aging (FCR liner method) surgery, and now I am in perfect health. I am still actively supporting the safety and stable operation of trains from below the tracks.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
Total Service Workflow for Submerged Maintenance Management ● FCR Primary Investigation 1. Conduct grass cutting and removal of surrounding sediment at the investigation site, and confirm the submerged pipe entrance. 2. Investigate the construction position, submerged diameter, submerged length, sediment accumulation status inside the submerged pipe, condition of the construction base, equipment access route status, and surrounding conditions, and create a submerged ledger. ● FCR Dredging and Camera Investigation 1. Remove sediment inside the submerged pipe. 2. Check the condition inside the submerged pipe using a submerged camera. ● FCR Lining Method 1. Perform a simple cleaning inside the submerged pipe. 2. Investigate the condition inside the submerged pipe before construction using a submerged camera. 3. Pull in FCR lining material into the submerged pipe, heat cure it, and create a pipe on the inside of the submerged structure.
Detailed information
-
Total service workflow for maintenance management.
-
Images of the interior before and after repairs.
catalog(1)
Download All CatalogsCompany information
Company Name FCR Corporation (FCR) *Field Cross drain: Refers to a railway crossing drainage system. *Repair: Means maintenance. Our company operates the FCR Method Association and the Antiviral Antibacterial Association.