"Concrete slab settlement correction method" contributes to the longevity of social infrastructure.
Using high-strength polyurethane resin, we will correct the deformations such as subsidence, steps, flapping, gaps, and voids that have occurred in the concrete slab, without excavation and within a short construction period.
The Upcon concrete slab settlement correction method (KT-080008-A, NETIS registration period ended October 2014) quickly resolves issues such as settlement, step differences, flapping, gaps, and voids that occur in concrete pavement slabs commonly used in highways and other areas. It utilizes specially developed high-strength polyurethane resin, allowing for a swift solution without breaking existing pavement slabs or requiring excavation work, thus achieving a short construction period. This minimizes the downtime of the facility and has established a track record as a planned and efficient method for maintaining social infrastructure. This technology is also employed not only on highways but in repair work for ports and airport aprons, as well as disaster recovery projects. Upcon will exhibit at the "Highway Techno Fair 2023," where cutting-edge technologies supporting highways will be showcased. Date: November 9 (Thursday) and 10 (Friday), 2023, from 10:00 to 17:00 Location: Tokyo Big Sight, West Hall 3 Exhibition Booth No: A-04 On the day of the event, we will also conduct a demonstration of settlement correction using polyurethane resin. We invite you to take this opportunity to see it. We look forward to your visit.
Inquire About This Product
basic information
【Concrete Pavement Slab Settlement Correction Method Features】 ■ Short Construction Period Polyurethane resin achieves the required strength approximately two hours after injection, allowing for early traffic reopening. ■ Settlement Correction Without Excavation Unlike conventional methods (concrete replacement), there is no need for the processes of dismantling, installing, forming, rebar placement, and curing that were necessary for concrete pavement slab replacement. ■ Improvement of Subgrade Looseness The polyurethane resin injected beneath the concrete slab expands, filling voids and gaps completely, while also improving the looseness of the surface subgrade. ■ Mobile Plant Vehicle Response Construction can be carried out simply by placing a construction plant vehicle equipped with all necessary materials within the restricted area. Upcon conducts everything from investigation to construction consistently and responds quickly, contributing to the longevity and maintenance of road, port, and airport infrastructure.
Price information
Concrete pavement slab Settlement correction Step correction Void filling
Delivery Time
Applications/Examples of results
catalog(10)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
![[Construction Case Study/Port Edition Vol.1] Port Maintenance Management Work (Quay Restoration) Settlement Correction and Void Filling](https://image.mono.ipros.com/public/catalog/image/01/93a/646469/IPROS7250851689726681210.jpeg?w=120&h=170)
![[Construction Case Study/Port Edition Vol.2] Onagawa Fishing Port Miyagazaki Quay Disaster Recovery Work](https://image.mono.ipros.com/public/catalog/image/01/f20/647656/IPROS5098479422774090087.jpg?w=120&h=170)
![[Construction Case Study/Road Edition Vol. 2] Joban Expressway Nagareyama IC Restoration and Repair Work](https://image.mono.ipros.com/public/catalog/image/01/d1a/652747/IPROS13288921954826130650.jpg?w=120&h=170)
![[Construction Case Study/Road Edition Vol. 1] Kanmon Tunnel Concrete Pavement Slab Void Filling Work](https://image.mono.ipros.com/public/catalog/image/01/67d/652383/IPROS18287232451842893111.jpg?w=120&h=170)
![[Construction Case Study / Port Edition Vol. 4] Sendai Shiogama Port (Ishinomaki Area) Hibari-no Chuo Pier Quay Disaster Recovery Work](https://image.mono.ipros.com/public/catalog/image/01/6e4/734399/IPROS3107554405782613509.jpeg?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.