Layout the hopper and dewatering machine in parallel! We will propose a design that fits within the specified space.
We would like to introduce a case where a malt-specific device was installed for a craft whiskey maker in Shizuoka Prefecture. Due to the production of over one ton of malt residue at a time, they faced challenges such as increased industrial waste costs and odor issues caused by decay. Given the limited installation space, we proposed a layout that arranged the hopper and dewatering machine in parallel to fit within the designated area. 【Overview】 ■ Challenges - Increased industrial waste costs and odor issues due to decay ■ Results - Proposed a layout that arranged the hopper and dewatering machine in parallel to fit within the designated space - While not completely eliminating, it is possible to somewhat suppress the odor of decaying malt residue through dewatering - The malt after dewatering is converted into feed, adopting an eco-feed system *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
Company information
Our company has been engaged in precision processing of various industrial machinery and parts, backed by our long-developed technical skills and excellent personnel. In recent years, as the demand for small lot production of various types and for high precision and high quality has been increasing, we have continuously established advanced technologies and introduced the latest equipment, creating a unique system as a tech support to meet the diversifying needs. We are challenging the possibilities for tomorrow and the future. We sincerely ask for your continued support and patronage.