Earthquake, heavy rain, and typhoon measures for electricity and power supply [Portable long-duration generator]
Aren't you prepared in advance for electricity and power in case of earthquakes, heavy rain, and typhoons? For electricity and power preparedness, consider the long-duration generator 【JPG Series】 with numerous case studies.
Prepare for electricity and power supply measures against earthquakes, heavy rain, and typhoons with a portable long-duration generator. The JPG series creates communication means in areas without power for initial response measures during disasters. This product has been introduced in many disaster sites for emergency power, BCP, recovery operations, etc. [Implementation Examples] 2008 Iwate-Miyagi Inland Earthquake 2011 Great East Japan Earthquake 2016 Kumamoto Earthquake 2018 Hokkaido Eastern Iburi Earthquake 2019 Boso Peninsula Typhoons No. 15 and No. 19 2020 Kumamoto Heavy Rain 2021 Atami Landslide Disaster 2024 Noto Peninsula Earthquake Additionally, - Patent obtained - Selected as a certified product under the Tokyo Metropolitan Government's Trial Order Certification System for FY 2023 - Received the 50th Invention Award for Contribution to Invention By combining with the portable automatic fuel supply system, the Intelligent Tank System (IGS), the JPG series allows for refueling while the engine is running, enabling operation without turning off the power to connected devices. [Features and Benefits] ■ Establish power supply in unresponsive areas and secure communication ■ Significant reduction in refueling frequency ■ Improved operational efficiency ■ Cost organization ■ Personnel assurance
Inquire About This Product
Related Videos
basic information
【Lineup】 <JPG Series> ■ Portable Long-Time Generator "JPG900" ■ Portable Long-Time Generator "JPG1800" ■ Portable Long-Time Generator "JPG2600" * Production and sales of the JPG2600 have ended, but we continue to provide support for maintenance and other services. ■ Portable Long-Time Generator "JPG2800" 【Other Lineup】 <Remote Specifications> Our [Generator + Battery Automatic Switching System] 【IGSS】 enables overwhelming long-time operation. ■ Remote Portable Long-Time Generator "JPG900R" ■ Remote Portable Long-Time Generator "JPG1800R" ■ Remote Portable Long-Time Generator "JPG2800R" ■ Remote Portable Long-Time Generator "JPG5500R" <Vehicle-Mounted Generators> ■ G-STREAM2800i ■ G-STREAM5500i Extending the operation time of existing generators <Modify Service> * For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(13)
Download All Catalogs![Function: Emergency Long-duration Generator Emergency Long-duration Power Generation Function [Long-duration generator born from voices at disaster sites] [2021/10/ver]](https://image.mono.ipros.com/public/catalog/image/01/1df/635857/IPROS8621227563196768957.jpeg?w=120&h=170)



Power Generator | Long-lasting Generator 【JPG Series】 AC100V | Portable long-lasting generator capable of parallel operation with an output of 2.8kVA.

![We received the [Special Award] at the "Tokyo Venture Technology Awards 2024" for our [Portable Long-Term Power Generator Redundancy Solution].](https://image.mono.ipros.com/public/catalog/image/01/8eb/781629/IPROS78346308113669713991.jpeg?w=120&h=170)

![The birth of a compact portable generator [900VA] [1800VA] that can be automatically started and stopped remotely.](https://image.mono.ipros.com/public/catalog/image/01/c67/712521/IPROS15625306594352142785.jpeg?w=120&h=170)

News about this product(3)
Company information
JP Generators Co., Ltd. is active as a rare supplier of small special generators in Japan, utilizing four technologies: generator technology, chassis technology, battery technology, and maintenance technology. ■ The vehicle-mounted generator [G-STREAM series] is for customers in communications, broadcasting, measurement, and more. ■ The portable long-duration generator [JPG series] is widely adopted in many locations as an emergency power source for the first 72 hours during major disasters such as earthquakes and heavy rains, as well as for BCP measures and recovery operations. [JPG series case studies] 2008: Iwate-Miyagi Inland Earthquake 2011: Great East Japan Earthquake 2016: Kumamoto Earthquake 2018: Hokkaido Iburi East Earthquake 2019: Typhoons No. 15 and 19 in Boso Peninsula 2020: Kumamoto Heavy Rain 2021: Atami Landslide Disaster 2024: Noto Peninsula Earthquake We will contribute to society with our comprehensive capabilities, not only in development and manufacturing but also in the maintenance, installation, and modification of generators and chassis. Please feel free to contact us if you have any requests.